One of Alys' main objectives for us on this trip was to install the stairs into the basement. The stairs will go on the far side of the bricked bearing wall shown here going down the middle of the basement. The long story short is that the house is not ready for the stairs to be installed at this time. As such, our work priority moved to the next top items in a long to-do list.
Previous           Next