Just like we've seen in Mexico, but with "professional" equipment. The crew installs vertical stantions, then "I" beams, then decking. On this they install rebar, then pour the floor. It takes a long time for this to cure (~21 days), then this structure is removed, and hopefully, the floor becomes self supporting.
Previous           Next